Advertisement

R E N E WE D & R E L O VE D
ASTORIA ARGENTA
Love Coffee Machines Ltd
Unit 3 Pear Tree Industrial Estate
Bath Road
Upper Langford
sales@lovecoffeemachines.co.uk
BS40 5DJ

Advertisement

Table of Contents
loading

Summary of Contents for Astoria ASTORIA ARGENTA

  • Page 1 R E N E WE D & R E L O VE D ASTORIA ARGENTA Love Coffee Machines Ltd Unit 3 Pear Tree Industrial Estate Bath Road Upper Langford sales@lovecoffeemachines.co.uk BS40 5DJ...
  • Page 2 ESPRESSO COFFEE MACHINE Use and maintenance manual. Instructions for the user. SAFETY PRECAUTIONS LEVEL OF TRAINING AND INFORMATION REQUIRED OF USER All persons using the equipment must be properly trained and informed on the operation and residual risks present during operation. Users must be able to apply all the good practices in respect of food hygiene principles.
  • Page 3 ELECTRICAL HAZARD When using the electrical appliance, several safety standards must be ob- served: o not touch the appliance with wet or damp hands or feet; do not use the appliance if barefooted; do not use extensions in rooms where there are showers or baths; do not pull the power cord to disconnect the appliance;...
  • Page 4 The appliance can only be used by people (including children under the age of 8) with reduced physical, sensory or mental abilities, or lack of experience or the necessary knowledge, if they are being supervised, or have received instructions regarding using the appliance safely and understanding the dangers inherent to it.
  • Page 5 MAINTENANCE AND CLEANING I.III The following residual risks are present during the maintenance and clean- ing of the machine and cannot be eliminated: ELECTRICAL HAZARD The maintenance and cleaning operations are subject to the behavioural safety rules: do not carry out the maintenance with the machine in operation; do not soak the machine in water;...
  • Page 6 DPI CHARACTERISTIC I.IV During maintenance and cleaning of the machine, the following PPE are re- quired: Gloves For the protection of all the machine parts in contact with food (fil- ter holders, filters, etc.). Perform only the maintenance and cleaning operations described in this manual.
  • Page 7: Table Of Contents

    ESPRESSO COFFEE MACHINE Use and maintenance manual. Instructions for the user. Summary INTRODUCTION ............... 45 10. DECOMMISSIONING .............. 72 Guidelines for reading the Manual ........45 11. DISMANTLING ..............72 Storing the Manual ............. 45 12. DISPOSAL ................72 Method for updating the Instruction Manual ...... 46 12.1 Information for disposal ............
  • Page 8: Introduction

    INTRODUCTION ABBREVIATIONS Sect. = Section Chap. = Chapter Please read this manual in its entirety before using Par. = Paragraph the device, in order to optimize machine performance = Page and operate it safely. Fig. = Figure The espresso coffee maker that you have purchased Tab.
  • Page 9: Method For Updating The Instruction Manual

    Method for updating the Instruction Glossary and Pictograms Manual This paragraph lists uncommon terms or terms with different meaning from the ordinary. The Manufacturer reserves the right to modify and make Below is an explanation of the abbreviations used and improvements to the machine without notifying it and without the meaning of the pictograms to indicate the operator updating the Manual already delivered to the user.
  • Page 10: Identification Of The Machine

    Client Assistance ASTORIA MACCHINE PER CAFFÈ S.R.L. ASTORIA MACCHINE PER CAFFÈ S.R.L. Via Condotti Bardini, 1 - 31058 SUSEGANA (TV) - ITALY Via Condotti Bardini, 1 - 31058 SUSEGANA (TV) - ITALY Tel.
  • Page 11 PERMITTED USES INCORRECT USE OF THE MACHINE All uses compatible with the technical The type of use and performance this characteristics, operations and applica- machine is designed for, imposes a num- tions described in this document that ber of operations and procedures that do not endanger the safety of the User cannot be changed, unless previously or cause damage to the machine or the...
  • Page 12: Illustration Of The Machine

    Illustration of the machine Cup heater surface. AL version Lever units. Boiler water optical level (**). Pressure gauge. Steam knob. Anti-scalding protection. Steam nozzle. 2-Cup filter holder. Adjustable foot. 10. Hot water nozzle. 11. Gas burner window (*). 12. 1-Cup filter holder. 13.
  • Page 13: Push-Button Panels Aep-Sae Versions

    Push-button panels AEP-SAE versions Manual dispensing of coffee PROG. STOP 1 espresso 1 long Stop coffee coffee Programm. 2 long Espressos coffees PROG. STOP 1 espresso 1 medium 1 long Stop coffee coffee coffee Programm. 2 medium 2 long Espressos coffees coffees Manual dispensing...
  • Page 14: Push-Button Panels Display Versions

    Push-button panels Display versions Display water Manual Manual dispensing dispensing of coffee of coffee PROG. PROG. STOP STOP Mode Increases Stop Mode Increases Stop ( + ) Programm. ( + ) Programm. Enter Decreases Enter Decreases ( - ) ( - ) Autosteamer Autosteamer USER manual...
  • Page 15: Ce Data And Marking

    Below is an example of the nameplate: INSTALLATION MARCHIO COMMERCIALE The installation of the machine must be performed ASTORIA MACCHINE PER CAFFÈ S.R.L. Via C. Bardini,1 SUSEGANA (TV) - ITALY only by the Manufacturer's Qualified Technicians. Tel. +39.0438.6615 Fax +39.0438.60657 S/N: Mod.
  • Page 16: Commissioning

    COMMISSIONING Turning the machine on and off 6.3.1 Electrical heating (versions without Display) The commissioning of the machine must be per- formed only by the Manufacturer's Qualified Technicians. Before switching the machine on make sure that the water level in the boiler is over the minimum indicated by the optical level (1).
  • Page 17 6.3.2 Electrical heating (versions with Display) 6.3.3 Gas heating (where the gas system is fitted) Press the ‘s main switch (16); Rotate selector (A) to position 1; open the gas valve (B) on the mains; hold down the push button (C) and, at the same time, press the on button (D).
  • Page 18: Renewing The Water

    Renewing the water Preparing the machine During the installation of the machine, the Qualified 6.5.1 Coffee grinding and dosing Technician must replace the water contained in the hy- It is important to have a dosing-grinding device next draulic circuits by following these steps: to the machine with which to grind the coffee to use when installation is complete, the appliance has to daily.
  • Page 19: Dispensing Of The Coffee

    Dispensing of the coffee 6.6.3 SAE - DISPLAY version PROGRAMMING 6.6.1 AL version The machine is programmed by default. Should coffee doses need to be modified, proceed as Put the coffee cup under follows: the dispensing spout Always programme the right- hand push-button panel first.
  • Page 20: Steam Dispensing

    Steam dispensing COFFEE DISPENSING 6.7.1 Version with rotating knob Put the coffee cup under the dispensing spout Immerse the steam nozzle in the liquid to be heated; press the desired dose key, for example and wait for the PROG. STOP coffee to be dispensed (LED comes on);...
  • Page 21: Version With Lever Knob

    Manual dispensing of hot water version with lever knob (AL - AEP versions) Immerse the steam nozzle in Place the jug under the hot water the liquid to be heated; spout; operate the knob of the tap horizontally; rotate the tap knob clockwise; the quantity of steam the dispensing of hot will be proportional...
  • Page 22: Automatic Dispensing Of Hot Water (Sae - Display)

    Automatic dispensing of hot water 6.10 DISPENSING OF HOT WATER (SAE - DISPLAY versions) PROGRAMMING Place the jug under the hot water nozzle; The machine is programmed by default. Should the hot water doses have to be modified, proceed as fol- lows: press water button and wait...
  • Page 23: Dispensing With Autosteamer

    Dispensing with Autosteamer 6.11 6.11.2 Adjusting the temperature To adjust the temperature of the autosteamer inter- vention, proceed as follows: 6.11.1 Dispensing PROG. STOP Press and keep pressed button of the right-hand push-but- PROG. STOP Immerse the terminals of ton panel for at least 5 seconds; the autosteamer spout press button repeatedly...
  • Page 24: Cappuccino Dispensing

    Cup warmer 6.11.3 Tips 6.13 Only heat the amount of milk that you intend to use; once heated, it will have to be completely poured out 6.13.1 AL - AEP version of the jug and cannot be reheated; the autosteamer guarantees a correspondence of To use the cup warmer, proceed as follows: ±...
  • Page 25 6.13.2 SAE version 6.13.3 DISPLAY version To use the cup warmer, proceed as follows: To use the cup warmer, proceed as follows: Place the cups on Place the cups on the coffee machine cup warmer (1); the coffee machine move the cup warmer switch (26) to the ON position. cup warmer (1);...
  • Page 26: Programming Of Machine Parameters (Display)

    Programming of machine parameters 6.14 1.0 BAR 120°C (DISPLAY version) 09:16 09-10-12 5 6.14.1 Access to menu (MODE ) x 3 sec. To access the programming menu, press and keep CLOCK SETUP pressed button (MODE) for at least 3 seconds; 09:16 18-10-12 1 to scroll the various areas of the programming menu, (MODE ).
  • Page 27 6.14.2 Clock programming 6.14.5 ProgrammingDay of rest Modify time, date and day of the week: To program machine shutdown for rest day(s), follow the instructions below: Enter programming until the following is displayed; Enter programming modify the param- DAYS WORKED until the display eter at the flashing 1234567...
  • Page 28 6.14.7 Display and zeroing of the litres counter 6.14.10 Programming Cup warmer To display the litres counter and for zeroing: Programming temperature and activation of the cup warmer: Enter programming until the litres count is displayed; Enter programming To perform the zero- CUP WARMER until the following ap- LITRES COUNTER...
  • Page 29: Reading And Zeroing Data

    6.14.13 Zeroing of dosing units alarms 6.15.2 Zeroing the Counts W i t h b u t t o n To zero the counts of the single dose buttons, proceed (MODE) scroll the as follows: DOSER UNITS ALARM menu through to p r e s s a n d k e e p the doser units’...
  • Page 30: Maintenance And Cleaning

    MAINTENANCE AND CLEANING Maintenance after a brief period of machine inactivity Safety precautions "Short machine downtime" refers to a period of time exceeding one working week. If the machine is reactivated after this period, the Qualified Technician must replace all the water contained in the hydraulic circuits as indicated in par.
  • Page 31: Malfunctions And Solutions

    Malfunctions and solutions. Problem Cause Action MACHINE LACKING POWER The machine is off. Turn on the machine. NO WATER IN BOILER The water supply tap is closed. Open the water supply tap. Turn off the machine and request the Technical TOO MUCH WATER IN THE BOILER Malfunction of the electrical system or hydraulic system.
  • Page 32: Cleaning Operations

    Problem Cause Action THE MOTOR STOPS SUDDENLY OR THE Turn off the machine and request the Technical THERMAL PROTECTOR INTERVENES Pump malfunction. Assistance. DUE TO OVERLOAD THE PUMP FUNCTIONS BELOW Turn off the machine and request the Technical Pump malfunction. NOMINAL CAPACITY Assistance.
  • Page 33 7.5.2 Cappuccino-maker wash 7.5.4 Washing of dispensing unit AEP version Use special care in cleaning the cappuccino maker, Wash the dispensing units daily, as instructed here- following the procedures indicated below: under: do a first washing by immersing the suction tube in Remove the fil- water and run a delivery for a few seconds;...
  • Page 34 to activate the wash, press button 2 again (buttons 7.5.6 Perforated disk and containment ring cleaning 1 and 2 flashing - in the versions with display the fol- Weekly perform the cleaning of the Perforated disk lowing message is shown: and containment ring in the following way: UNIT WASHING...
  • Page 35: Display Signalling

    DISPLAY SIGNALLING DECOMMISSIONING The machine must be decommissioned by the Manu- Cause facturer's Qualified Technician, because the equipment Boiler filled with water when using the machine for the first time or must be disconnected from the electricity and water when refilling to reach the water mains, and all the internal circuits must be emptied of 1.0 BAR 120°C...
  • Page 36: Environmental Information

    Your cooperation in the correct disposal of this prod- Risk uct will contribute to the effective usage of natural re- Combination of the probability and severity of an sources and avoid incurring the administrative sanctions injury or damage to health that can arise in a hazardous provided by law.
  • Page 37: Alphabetical Index Of Topics

    ALPHABETICAL INDEX OF Instructions Manual - Update Intended use TOPICS Internal battery Language Absorbed power AEP-SAE push button panels Machine cleaning AEP version Machine dismantling AL group Machine disposal Automatic hot water Machine operation Autosteamer Machine parameter programming 65 Machine storage Blind filter Maintenance and cleaning Make/Model of the machine...
  • Page 38 La responsabilidad de elaborar y conservar el expediente técnico corresponde alla ASTORIA MC S.R.L. Via Condotti Bardini,1 - 31058 SUSEGANA (TV) - ITALIA La tâche de constituer et de conserver le dossier technique est confiée à la ASTORIA MC S.R.L. Via Condotti Bardini,1 - 31058 SUSEGANA (TV) - ITALIE The ASTORIA MC S.R.L.
  • Page 39 Ogni macchina è corredata dalla Dichiarazione di Conformità PED di cui qui sotto è riportato un esempio Each machine is accompanied by the PED Declaration of Conformity - see example below Chaque machine est accompagnée d'une Déclaration de conformité PED dont vous trouverez un exemple ci-dessous Jeder Maschine liegt die PED-Konformitätserklärung bei, die hier unten als Beispiel abgebildet ist Cada máquina se suministra junto con la Declaración de Conformidad PED cuyo ejemplo se muestra a continuación A máquina é...
  • Page 40 ASTORIA MACCHINE PER CAFFÈ S.R.L. Via Condotti Bardini, 1 - 31058 SUSEGANA (TV) - ITALY Tel. +39.0438.6615 - Fax +39.0438.60657 www.astoria.com - info@astoria.com Cod. 02000700 - Rev. 00 - 03/2018...

Table of Contents