REMKO EMT 100 Assembly And Operating Instructions Manual page 26

Inverter heat pump
Table of Contents

Advertisement

REMKO EMF / EMT
WARNING!
All electric lines are in accordance VDE regula-
tions to dimension and to lay.
General Information
n
These instructions are to be observed when
installing the entire system.
The device should be delivered as near as
n
possible to the site of installation in its original
packaging in order to avoid transport damage.
n
The device is to be checked for visible signs of
transport damage. Possible defects must be
reported immediately to contract partners and
the forwarding agent.
n
Suitable sites for installation are to be selected
with regard to machinery noise and the set-up
process.
n
The shut-off valves for the refrigerant lines may
only be opened immediately before commis-
sioning of the system.
The exterior components are pre-filled with
n
refrigerant up to a distance of 10 meters from
the interior component. If the basic length of
the refrigerant line exceeds 10 metres, add
refrigerant.
n
Establish all electrical connections in accord-
ance with the relevant DIN and VDE standards.
n
The electrical power cables must be fastened
to the electrical terminals in the proper manner.
Otherwise there is a risk of fire.
n
See that neither refrigerant or pipes that carry
water pass through living- or sleeping areas.
NOTICE!
Open refrigerant pipes must be protected
against the introduction of moisture by means
of suitable caps or adhesive strips Refrigerant
pipes may not be kinked or compressed.
Refrigerant pipes may only be cut to length
with a suitable pipe cutter (use no hacksaws or
the like).
DANGER!
The installation of refrigerant equipment may
be undertaken only by trained specialist per-
sonnel!
26
DANGER!
All electrical installation work is to be per-
formed by speciality companies.
Wall breakthroughs
n
A wall opening of at least 70 mm diameter and
10 mm slope from the inside to the outside
must be created.
n
To prevent damage, the interior of the wall
opening should be padded or, for example,
lined with PVC pipe (see figure).
n
After installation has been completed, use a
suitable sealing compound to close off the wall
breakthrough under observation of fire protec-
tion regulations (responsibility of customer).
2
1
3
Fig. 24: Wall breakthroughs
1. Liquid line
2. Control cable
3. Supply
4. Hot gas line
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emf 100Cmt 180Cmf 180Cmt 120Cmf 120Cmf 160 ... Show all