Eaton W-VAC Series Instructions For Installation, Operation And Maintenance page 31

Vacuum circuit breaker
Table of Contents

Advertisement

 
  
Step 6: Withdraw Breaker from Test Position:
1. For the single tier configuration carriage assembly
version, lift the shoot bolt lever and pull the breaker
out. The breaker will close and trip as it comes out
from the Test position.
2. For the double tier configuration cradle assembly
version, retract the horizontal shoot bolts and pull
the breaker out. The breaker will close and trip as it
comes out from the Test position.
IB131009EN
 
Instruction Book
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents