WCS position encoding system
Mounting the Code Rail
7.3.8
Grounding the Aluminum Profile System
Connect the aluminum profile with the plant potential at low resistance at least every 30 m.
Figure 7.24
7.3.9
Integration of the WCS Code Rail in Conductor Lines
In many applications, electrical energy is transferred to the carriage via conductor lines.
Pepperl+Fuchs offers an integrated solution of power transmission and position measurement.
This requirement was taken into account in the development of the new Vahle VKS 10
conductor line. The VKS 10 is flexible in terms of the number of conductors and cross-sections
and facilitates cost-effective integration of the WCS code rail in the plastic base body of the
conductor line.
56
Grounding