Fill The Condensate Collector - Rinnai I Series Installation And Operation Manual

Wall-mounted, gas-fired combi boiler, central heating and domestic hot water
Hide thumbs Also See for I Series:
Table of Contents

Advertisement

Securely screw the top and bottom
brackets into the wall, making sure
the screws are flush with the wall.
Use any of the holes in the top
and bottom brackets.
Make sure the securing method is
sufficient to support the weight of
the boiler. Refer to the boiler
weight in section "3.4
Specifications" of this manual.
IMPORTANT
The boiler must be installed in an
upright and level position. Do not
install the boiler upside down or on
its side.
Top
Bracket
Bottom
Bracket
20
WARNING
Before operation of the boiler, the
condensate collector must be filled with
water. This is to prevent the potential of
exhaust gasses from entering the building.
Failure to fill the condensate collector could
result in severe personal injury or death.
The condensate collector must be filled with
water prior to installing the vent system.
Pour approximately 10 ounces (1.25 cups) of
water directly into the boiler's exhaust port
(do not remove the 2 in. PVC adapter prior to
this).
Exhaust
Port
Rinnai I-Series Condensing Boiler Combi Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents