11
Complete the following checklist when boiler installation is complete. You should be able to answer YES to each
question. If you answer NO, installation is not complete. Refer to the applicable section in this manual for
additional information.
INSTALLATION LOCATION
Have you verified the unit, vent and air intakes meet the clearance requirements?
VENTING
Have all corrosive compounds been removed from around the combustion air intake of the boiler?
Have you followed the combustion air requirements to provide sufficient combustion air for the boiler?
Are the correct venting products for the installed model being utilized?
Have you installed the vent screen(s) for Schedule 40 PVC/CPVC vent applications if applicable?
Have you verified the vent system does not exceed maximum length?
SYSTEM PIPING
Have the water lines been purged of all debris and the filter cleaned?
Have you verified the hot and cold water lines to the boiler are not interchanged?
Does the water supply to the boiler have adequate pressure? Is it free of chemicals? Did you verify it
does not exceed total hardness that will damage the heat exchanger?
Have you verified that no toxic chemicals were introduced to the potable water?
Did you drain the boiler if not intended to be used immediately?
Have water quality issues (if any) been addressed?
Have you performed the leak and pressure test for the boiler and plumbing system?
Are the isolation valves installed? (for DHW systems only)
CONDENSATE DRAIN
If the condensate pump is installed, is it wired to deactivate the boiler in the event of failure?
Did you verify the condensate drain pipe is as short as possible and has a downward pitch toward the
drain or condensate pump?
Is all condensate drained and disposed of as per local codes?
Did you use ONLY corrosion resistant materials for the condensate drain lines?
Did you verify the condensate drain pipe along its entire length is at least the same diameter as the
drain line?
Did you check to ensure the condensation drain lines are protected from freezing?
Have you verified the condensate drain line is not plumbed with the pressure relief valve?
Have you confirmed the condensate drain line is not connected with an air conditioning evaporator coil
drain?
This boiler has an integrated condensate trap. Have you verified that an external condensate trap is not
installed?
Have you confirmed the end of the condensate drain pipe is open to atmosphere?
Has an air gap been installed in the condensate drain line?