Se4710 Integration Guide; Mounting - Motorola SE4710 Integration Manual

Table of Contents

Advertisement

2 - 6

SE4710 Integration Guide

Mounting

There are several mounting holes (M1.4x0.3) and locator holes on both the top and bottom of the chassis (see
Figure
2-4). The SE4710 can be mounted in any orientation without degradation in performance.
When installing the mounting screws, ensure they do not protrude past the mounting hole threads in the chassis;
use 2.1 mm maximum mounting screw thread engagement. Recommended mounting screw torque is 0.7 ±0.1
in-lbf (8.0 ± 1.0 cm-N).
SE4710 Mounting Diagram
Figure 2-4
Notes
Unless otherwise specified:
Engine has two mounting surfaces with
mirrored locating and mounting features,
and can be secured to either surface.
Holes marked "A" or "B" are engine
locating aides.
Holes marked "C" are threaded mounting
holes.
This is a reference drawing and is not
intended to specify, or guarantee all
possible integration requirements for this
engine.
All dimensions are in mm. All untoleranced
dimensions follow a general tolerance of
+/- 0.15 mm.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents