For how to install, please refer to the following instructions.
1. Use the bracket ears provided in your RT 1-3kVA UPS to install the UPS at
the front of the rack. Please refer to Figure 19 and your UPS's Installation
& Operation Quick Guide.
2. Use the bracket ears provided in your RT 1-3kVA external battery pack
to install the external battery pack at the front of the rack. Please refer to
Figure 19 and your external battery pack's User Manual.
3. Use the four M4 screws (
and right sides of the MBB. Please see Figure 20.
4. Fix the four M5 cage nuts (
that the MBB should be installed at the rear of the rack. Please see Figure
20.
5. Use the four M5 screws (
). Please see Figure 20.
7
6. Install the UPS Output Cover (
screws (
Amplon RT Series
5
). Please see Figure 20.
6
) to install the two MBB Ears (
4
) at the two sides of the rack. Please note
7
) to secure the MBB on the rack's M5 cage nuts (
) at the back of the UPS with two #6-32
3
2 2
) at the left
1