Delta Amplon RT Series User Manual page 23

Single phase 1/1.5/2/3 kva maintenance bypass box
Hide thumbs Also See for Amplon RT Series:
Table of Contents

Advertisement

6
UPS
External
Battery
Pack
For how to install, please refer to the following instructions.
1. Use the bracket ears provided in your RT 1-3kVA UPS to install the UPS at
the front of the rack. Please refer to Figure 15 and your UPS's Installation
& Operation Quick Guide.
2. Use the bracket ears provided in your RT 1-3kVA external battery pack
to install the external battery pack at the front of the rack. Please refer to
Figure 15 and your external battery pack's User Manual.
3. Fix the MBB Ear (
head M4 screws (
screws (
5
4. Fix the MBB Ear (
M4 screws (
Please see Figure 16.
5. Install the UPS Output Cover (
screws (
8
PDB1116A1300B8/ PDB1117A1300B8
z
z
NOTE :
Since models PDB1115A1300B8 and PDB1117A1300B8 have the same
standard accessories and the accessory installation methods are the
same, only model PDB1115A1300B8 is used for illustration (please see
Figure 17 ~ Figure 20).
× 2 PCS
5
× 2 PCS
3
) at the rear of the external battery pack with two pan-
3
) and at the left side of the MBB with two flat-head M4
6
). Please see Figure 16.
) at the right side of the external battery pack with two
2
) and at the right side of the MBB with one #6-32 screw (
6
). Please see Figure 16.
Chapter 8
× 1 PC
8
MBB
× 2 PCS
8
× 1 PC
(Figure 16)
) at the back of the UPS with two #6-32
4
1 9
How to Install the Maintenance
Bypass Box on the Rack
× 1 PC
2
× 2 PCS
5
4
× 1 PC
External
Battery
Pack
UPS
).
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mbb-rt-1.5kMbb-rt-2kMbb-rt-3k

Table of Contents