Scenario 1: Only the UPS and MBB need to be installed on the rack. For such
application, the UPS must be installed at the front of the rack, the MBB at the
rear of the rack (see Figure 17 and Figure 18), and the total height is 2U (see
Figure 17).
UPS
For how to install, please refer to the following instructions.
1. Use the bracket ears provided in your RT 1-3kVA UPS to install the UPS at
the front of the rack. Please refer to Figure 17 and your UPS's Installation
& Operation Quick Guide.
2. Use the four M4 screws (
and right sides of the MBB. Please see Figure 18.
Amplon RT Series
UPS
× 1 PC
1
MBB
× 2 PCS
× 2 PCS
5
4
× 2 PCS
7
ESC
(Figure 17)
MBB
(Figure 18)
) to install the two MBB Ears (
4
2 0
Height :
2U
× 1 PC
3
5
7
× 2 PCS
× 1 PC
4
1
1
UPS
× 2 PCS
6
× 2 PCS
× 2 PCS
) at the left