Connect Cables, Turn on Power, and Verify Connectivity

Cisco Firepower Threat Defense for Firepower 9300 Quick Start Guide
Connect Cables, Turn on Power, and Verify Connectivity
After rack mounting and grounding the Firepower 9300 chassis, follow these steps to connect cables, turn on
power, and verify connectivity.
Step 1
Console port—Using a serial console cable, connect a computer or terminal server to the RJ-45 serial console port (baud
rate is 9600) so that you can use the CLI to initially set up the Firepower 9300.
After initial setup you can connect to the Management interface using SSH, Telnet, or HTTPs to the Chassis Manager to
continue configuring the Firepower 9300.
Step 2
Management interface—Install the 1-Gigabit Ethernet transceiver that was provided in the Firepower 9300 accessory
kit in the Management port, and then using an Ethernet cable, connect a management computer directly to the transceiver
on the Supervisor.
Figure 42: Connect the Cables to the Firepower 9300
1
Console port (RJ-45)
3
10 Gigabit Ethernet data interfaces for SFP+
transceivers showing the cable and SFP
transceiver
Note
Step 3
SFP/SFP+ transceivers—Install any supported SFP/SFP+ transceivers you need in the Ethernet network interfaces on
the Supervisor or network modules.
Cisco Firepower 9300 Hardware Installation Guide
56
See
Front Panel, on page 8
for the
other data ports available on the
security and network modules.
2
1 Gigabit Ethernet Management interface
(RJ-45) with the cable and SFP transceiver
4
10 Gigabit Ethernet data interfaces for SFP+
transceivers showing the cable and SFP
transceiver
Note
See
Front Panel, on page 8
other data ports available on the
security and network modules.
Mount and Connect
for the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents