STEP 4
ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 2-1/2" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH 8x2 1/2
10 FOOT SLIDE ASSEMBLY
SCREW PFH 8x2 1/2
45
SCREW PFH
(38)
8x2 1/2