Backyard Discovery SKYFORT II SWING SET Owner's Manual & Assembly Instructions page 39

Table of Contents

Advertisement

DS - SLIDE RAIL 10' BOTTOM RIGHT GREEN - A100031
DR - SLIDE RAIL 10' BOTTOM LEFT GREEN - A100030
STEP 2
BUILD 2 SIDE RAILS, MAKING A LEFT AND RIGHT
ASSEMBLY.
NUT BARREL WH 5/16x1 1/2
10 FOOT SLIDE ASSEMBLY
TR - SLIDE RAIL 10' TOP RIGHT GREEN - A100033
DT - SLIDE RAIL 10' TOP LEFT GREEN - A100032
WASHER LOCK EXT 8x19
BOLT WH 5/16x3/4
43
BOLT WH
(8)
5/16x3/4
WASHER
(8)
LOCK EXT
8x19
NUT BARREL
(8)
WH 5/16x1 1/2
Using an 1/8" drill bit,
Pilot drill all screw dimples
along the bottom and end
edge of the slide rails.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents