Mounting
Topics covered in this chapter:
2.1

Prepare the installation

Before you can install the meter and fit the thermal insulation, verify that the system is
stable and leak free.
1.
2.
2.2

Mount the meter

There are three ways to mount the meter.
Related information
2.2.1
Mount with a flow-through chamber
Flow-through chambers are manufactured by Micro Motion, and are available with either
of the following:
Important
Do not alter the length of the inlet and outlet pipes. Pipe alterations can adversely affect the fitting
temperature response and stability.
Prerequisites
Verify the following conditions:
Installation Manual
Prepare the installation
Mount the meter
Install thermal insulation
Rotate the electronics on the meter (optional)
Rotate the display on the transmitter (optional)
Fit a blanking compression nut to the meter mounting, pressurize, and flush the
system.
Isolate the system, depressurize, and remove the blanking compression nut.
Mount with a flow-through chamber
Mount with an inline viscosity retrofit kit
Mount with a capillary viscosity retrofit kit
Welded ends or compression fittings that connect into the process pipelines
1- inch, 2-inch, or 3-inch inlet and outlet pipes
Mounting