Maintenance; Routine Maintenance Procedures; Battery Operation - CareFusion Alaris VP Plus Guardrails Directions For Use Manual

Volumetric pump
Table of Contents

Advertisement

Maintenance

Routine Maintenance Procedures

To ensure that this Pump remains in good operating condition, it is important to keep it clean and carry out the routine maintenance
procedures described below .
Interval
As per Hospital Policy
Each usage
Before the transfer of the Pump to a
new patient and as required
If the Pump is dropped, damaged, subjected to excessive moisture or high temperature, immediately take it out of
A
service for examination by qualified service personnel.
All preventative and corrective maintenance and all such activities shall be performed at a compliant workplace in
accordance with the information supplied. CareFusion is not responsible should any of these actions be performed
outside the instructions or information supplied by CareFusion. For Preventative and Corrective Maintenance
instructions please refer to the Technical Service Manual (TSM).
All servicing should only be performed by qualified service personnel with reference to the TSM.
It is important to ensure that you only refer to the most recent version of the Directions for Use and Technical Service
A
Manual for your CareFusion products. These documents are referenced on www.carefusion.com. Copies can be
obtained by contacting your local CareFusion representative.
Please refer to Technical Service Manual for calibration procedures. The units of measurement used in the calibration
A
procedure are standard SI (The International System of Units) units.

Battery Operation

The internal rechargeable battery allows continued operation when the AC power is unavailable, for example during patient transfer or
AC power failure . When connected to the AC power supply for 4 hours, (whether the Pump is in use or not) a new battery pack will be
fully charged .
The battery is maintenance free, sealed Nickel Metal Hydride and requires no routine servicing . To achieve optimum operation, ensure
that the battery is fully recharged after full discharge, before storage, and at regular 3 month intervals during storage .
Charge retention will eventually degrade . Where retention is critical the internal battery should be replaced every 3 years .
It is recommended that only qualified service personnel replace the battery . For further information regarding the replacement of
batteries refer to the Technical Service Manual .
The battery pack used in this Alaris Volumetric Pump is manufactured by CareFusion and includes a proprietary PCB (printed circuit
board) designed specifically for the Alaris Volumetric Pump, and in conjunction with Alaris Volumetric Pump software, controls battery
use, charge and temperature . Any use of battery packs that are not manufactured by CareFusion in the Alaris Volumetric Pump is at
your sole risk, and CareFusion does not provide any warranty for or endorsement on any battery packs that are not manufactured by
CareFusion . CareFusion's product warranty shall not apply in the event the Alaris Volumetric Pump has suffered damage or premature
wear, or malfunctions or otherwise operates incorrectly, as a result of use with a battery pack that is not manufactured by CareFusion .
Routine Maintenance Procedure
Thoroughly clean external surfaces of the Pump before and after prolonged period of
storage .
1 . Inspect AC power supply plug and cable for damage .
2 . Inspect case, keypad and mechanism for damage .
3 . Check Start up self-test operation is correct .
4 . Check for activation of both the alert indicator and audio function during the Pump
start-up .
Clean the Pump by wiping over with a lint-free cloth lightly dampened with warm water and
a standard disinfectant/detergent solution .
1000DF00660 Issue 9
Alaris™ VP Plus Guardrails™ Volumetric Pump
41/48
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents