Chapter 2. Installation; Introduction - GE TransPort PT900 User Manual

Portable ultrasonic flow meter for liquids
Hide thumbs Also See for TransPort PT900:
Table of Contents

Advertisement

Chapter 2. Installation

2.1 Introduction

To ensure safe and reliable operation of the PT900, the system must be installed in
accordance with established GE guidelines. Those guidelines are explained in
detail in this chapter and include the following topics:
Unpacking the PT900 System (see page 4)
Mounting the PT900 Transmitter (see page 7)
Installing the Clamp-On Fixture and Transducers (see page 7)
Making the Electrical Connections (see page 33)
WARNING!
rate of many fluids, some of which are potentially hazardous.
The importance of proper safety practices cannot be
overemphasized.
WARNING!
and regulations for installing electrical equipment and working
with hazardous fluids or flow conditions. Consult company safety
personnel or local safety authorities to verify the safety of any
procedure or practice.
ATTENTION EUROPEAN CUSTOMERS!
Mark requirements, all cables must meet the specifications in
"Customer Cable Requirements for AIO/DIO Connections" on
page 155.
®
TransPort
PT900 User's Manual
The PT900 flow transmitter can measure the flow
Be sure to follow all applicable local safety codes
Chapter 2. Installation
To meet CE Mark and UL
3

Advertisement

Table of Contents
loading

Table of Contents