Installation Planning; Chassis Dimensions; Mounting Bracket Options - GE MDS TD220MAX Technical Manual

Robust communications for positive train control
Hide thumbs Also See for MDS TD220MAX:
Table of Contents

Advertisement

3.0 INSTALLATION PLANNING

This section covers pre-installation factors that should be considered when installing the transceiver in the
field. Careful planning will help achieve optimal performance from the transceiver. The specific details at
an installation site may vary, but there are four main requirements for installing the transceiver in all
cases:
Adequate and stable primary power
An efficient and properly installed antenna system
Ethernet connection to local network
Proper connections to a time source (PTP, GPS, Over-The-Air)
3.1

Chassis Dimensions

Figure 4 shows the external chassis dimensions of the TD220MAX Transceiver.
3.2

Mounting Bracket Options

The transceiver is normally provided with flat mounting brackets attached to the bottom of the radio as
shown in Figure 5. An optional 35 mm DIN rail mounting bracket is also available and is described below.
4
5.625"
143 mm
Figure 4. Transceiver Dimensions
TD220MAX Technical Manual
MDS 05-6906A01, Rev R

Advertisement

Table of Contents
loading

Table of Contents