6 INSTALLATION
4. Make sure that the contact resistance is <0.1 Ω at 25 A at all connection points relevant for
attaching the protective earth conductor.
6.3
Mounting the Load onto the L-412.xx9211E0
Overview
Figure 6: Mounting the load onto the L-412.xx9211E0
1. Screws
2. Load
3. Motion platform of the L-412.xx9211E0
Tools and Accessories
■ At least 3 screws with suitable
■ Suitable tool for tightening the screws
■ Optional: 2 suitably dimensioned dowel pins as locating pins for aligning the load on the
L-412.xx9211E0
Requirements
You have read and understood the
✓
You have mounted the L-412.xx9211E0
✓
The L-412.xx9211E0 is not connected to the electronics.
✓
You have prepared the load so that it can be fixed to the mounting holes on the motion
✓
platform:
■ The distance between the center of gravity of the load and the center of the motion
platform is as small as possible in all directions.
■ At least three points are provided for fixing the load on the motion platform.
17
L412M0016EN ‒ 3/14/2019
dimensions (p. 32)
general safety instructions (p.
on the surface (p. 14)
7).
properly.
M O T I O N | P O S I T I O N I N G