Mounting The Load - PI L-412 9025E1 Series User Manual

Table of Contents

Advertisement

6 INSTALLATION
4. Make sure that the contact resistance is <0.1 Ω at 25 A at all points relevant for attaching
the protective earth conductor.
5. If there is any vibration in your application, secure the screw connection for the protective
earth conductor in a suitable manner (e.g., with liquid adhesive) to prevent it from
unscrewing by itself.
6.3

Mounting the Load

NOTICE
Impermissibly high load on the L-412.xx9025E1
An impermissibly high load on the L-412.xx9025E1 impairs the motion and can damage the
L-412.xx9025E1.
► Pay attention to the
L-412.xx9025E1.
► In the case of multi-axis systems, include the masses of the positioners to be moved
when calculating the load.
NOTICE
Excessively long screws and locating pins
Screws and locating pins that are inserted too deeply can damage the L-412.xx9025E1.
► Pay attention to the depth of the mounting and locating holes.
► Only use screws and locating pins of the correct length for the respective mounting holes.
Overview
Figure 9: Mounting the load onto the L-412.xx9025E1
Tools and Accessories
■ At least 3 screws with suitable
■ Suitable tool for tightening the screws
■ Optional: 2 suitably dimensioned dowel pins as locating pins for aligning the load on the
L-412.xx9025E1
Requirements
You have read and understood the
20
L412UM0002EN ‒ 10/24/2022
maximum permissible forces (p. 30)
dimensions (p. 34)
general safety instructions (p.
that may act on the
8).
M O T I O N | P O S I T I O N I N G

Advertisement

Table of Contents
loading

This manual is also suitable for:

L-412 9025e1b series

Table of Contents