Canister Bay Components; Canister Bays - Stratasys FDM Titan User Manual

Table of Contents

Advertisement

Material & Canisters

Canister Bay Components

The figure below shows the canister bay components:

Canister Bays

The machine has a total of four individual canister
bays. The two bays on the left hold modeling
material and two bays on the right hold support
material. Stratasys recommends that you install a
canister in all four canister bays to ensure maximum
efficiency for the air drying system. If necessary, an
empty canister may be installed in an inactive bay.
While building, two of the four canisters are active.
An active canister has material filament loaded to
the liquefiers (green LED).
Note: Modeling canisters and support canisters CANNOT be mixed. For
example, when building with ABS material, BOTH model canisters must
be ABS and both support canisters must be ABS_SS.
Whether the machine is idle or building, you can replace inactive canisters without
pausing the machine.
4 - 2
FDM Titan User Guide
Canister Drive Levers
Canister LED Indicators
Manual Oven Door Release Lever
Air Pressure Gauge
Vacuum Gauge
Waste Basket Location
Support Material Canisters
Model Material Canisters
Extra Storage

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents