Servicing The Y Axis Right Part - Trotec Speedy C12 Service Manual

Individual m ar king system
Table of Contents

Advertisement

12. Servicing the Y axis right part

The right part of the Y axis is a unique construction that you will find only in Trotec
machines. This construction makes sure that all three be arings are in contact with
the guide rail at any time. To reach that we use one spring loaded bearing which
presses against the rail.
The Y axis right part contains a Y axis bearing assembly and our well tried system of
belt tensioning.
Steps for servicing the Y-axis:
15. Take the X-axis out of the machine (please refer to the chapter: Servicing the
X axis)
16. Open the drive shaft connector
17. Take the right Y-axis out of the machine
There are five screws that fix it from the lower side to the aluminium profile
-
18. Release the main belt
Remove the tensioning bolt and tensioning wedge
-
NORMAL.DOT
max
fixing screws of the Y-axis
tensioning elements
Gespeichert in:G:\Support\Dokumentationen_CDs\8003Speedy\Service Manual\Servicemanual 8003.doc
I N D I V I D U A L M A R K I N G S Y S T E M S
Gespeichert am:2003/03/10
Version 14
Seite 60 von 87

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Speedy c25Speedy c100Speedy c50

Table of Contents