Download Print this page

Emerson Rosemount 5408 Quick Start Manual page 6

Process seal antenna
Hide thumbs Also See for Rosemount 5408:

Advertisement

Quick Start Guide
Step 2: Tighten the bolts and nuts
Note
Re-tighten after 24 hours and again after the first temperature cycle.
Check at regular intervals and re-tighten if necessary.
Table 1. Torque Value, lb-ft (N-m)
Process
connection size
2-in./DN50/50A
3-in./DN80/80A
4-in./DN100/100A
1. The conditions used for the calculation are: Standard mating metal flange, A193 B8M Cl.2 / A4-70
bolt material, and a friction coefficient of μ=0.16.
2. Low strength bolt and non-metallic mating flange may require lower tightening torque.
Step 3: Align the transmitter head (see page 8)
6
(1)(2)
ASME B16.5
Class 150
Class 300
29 (40)
52 (70)
33 (45)
48 (65)
59 (80)
52 (70)
Process connection rating
EN1092-1
PN6
PN10/PN16
15 (20)
26 (35)
37 (50)
37 (50)
37 (50)
37 (50)
October 2017
JIS B2220
PN25/PN40
10K
29 (40)
18 (25)
41 (55)
22 (30)
74 (100)
26 (35)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Rosemount 5408:sis