October 2017
Step 5: Connect the cable wires
Figure 3. Transmitter Wiring
A. Field Communicator
B. Approved IS barrier (for Intrinsically Safe installations only)
C. HART modem
D. Load resistance (≥250
E. Current meter
F. Power supply
Torque 7 in-lb (0.8 N-m)
Quick Start Guide
D
E
B
C
1
2
3
4
5
6
7
8
9
0
A
F
13