2
Assembly and start-up
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
The following steps should be performed to install and configure a switch:
Unpacking and checking
Installing the SFP modules (optional)
Adjust DIP switch settings
Connect the terminal block for voltage supply and signal
contact and connect the supply voltage
Install the device on the DIN rail, grounding
Install the terminal block, start-up procedure
Connecting the data lines
2.1
Installing the device
2.1.1
Unpacking and checking
Check that the contents of the package are complete
"Scope of
delivery").
Check the individual parts for transport damage.
2.1.2
Installing the SFP modules (optional)
Figure 9: Fast Ethernet / Gigabit Ethernet fiber optic SFP module
Before attaching an SFP module, first remove the protective cap over the
socket.
Push the SFP module with the lock closed into the socket until it latches
audibly in place.
Note: Only use Hirschmann SFP modules
RS20/RS30...U
Release 01 06/2012
(see page 38
(see page 39
"Accessories").
25