5.4 Test Case 4 – Simulate SMLT Leg Failure (ports
1 and 2 active)
The objective of this test case is to verify operations when one leg of the SMLT fails.
Test Steps
1)
Start Vdbench.
2)
While Vdbench is running, send
Layer 2 traffic to populate MAC
tables on all switches.
Remove Leg 1 of the SMLT.
(Ports 1 and 2 are the active
ports.)
3)
Verify that I/O continues from PC
to SRX.
5.5 Test Case 5 – Simulate SMLT Leg Failure (ports
3 and 4 active)
The objective of this test case is to verify operations when one leg of the SMLT fails.
Test Steps
1)
Start Vdbench.
2)
While Vdbench is running, send
Layer 2 traffic to populate MAC
tables on all switches.
Remove Leg 2 of the SMLT.
(Ports 3 and 4 are the active
ports.)
3)
Verify that I/O continues from PC
to SRX.
Avaya VSP 9000 / Avaya VSP 7000 with Coraid EtherDrive SRX-Series
August 2011
Expected Results
I/O traffic should fail over to the active
leg of the MLT.
Check the VSP 7000/9000 MAC table
and port statistics to make sure traffic
is forwarding and MAC is learning
properly.
Expected Results
I/O traffic should fail over to the active
leg of the MLT.
Check the VSP 7000/9000 MAC table
and port statistics to make sure traffic
is forwarding and MAC is learning
properly.
Storage Appliances TCG
avaya.com
Actual Results
Pass
Pass
Pass
Actual Results
Pass
Pass
Pass
26