Prepare To Log Data - In-situ Level Troll 300 Operator's Manual

Table of Contents

Advertisement

seCtion 4: usinG Win-situ
TIP: For more
complete
information on
setting up data logs, see
Win-Situ's Help menu.
TIP: For a Level
TROLL 300 or
other non-vented
Level TROLL that will be
deployed on wire, be sure
to select a Scheduled Start
so the log will start by itself,
without a communication
connection.
Level trOll Operator's Manual

prepare to LoG data

1. To program the device to log data, first select the Logging tab.
2. Click the "New" button.
Logging tab
"New" button
The Logging Setup Wizard will prompt you through the configuration of a
data log—including the site, log name, parameters to measure, sample
schedule, start time, stop time, output (depth or level), and other options.
For details on setting the pressure sensor output, refer to Win-Situ's Help
menu, or
Section 5
in this manual.
40
0052210 rev. 006

Advertisement

Table of Contents
loading

This manual is also suitable for:

Level troll 500BarotrollLevel troll 700

Table of Contents