Elation PROTRON ECLYPSE User Manual page 14

Table of Contents

Advertisement

I N S T A L L A T I O N G U I D E L I N E S
Horizontal Fixture Linking
1. Remove spring-loaded locking-pin, compress the spring enough to clear the rail, rotate ring to vertical
orientation (stepped rail-block to a horizontal orientation), and pull it straight out.
2. To horizontally secure two adjacent fixtures, each fixture has an integrated locking-pin
abutment-block that is activated to bridge and secure the adjoining unit.
3. Press-click the locking-pin abutment block to release the spring-loaded locking mechanism; thi
will pop the abutment-block out towards the adjacent fixture.
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents