Elation PROTRON ECLYPSE User Manual page 13

Table of Contents

Advertisement

I N S T A L L A T I O N G U I D E L I N E S
LINKING FIXTURES
The fixture includes integrated spring-loaded locking pins which are used to connect
multiple fixtures together horizontally and vertically to create seamless custom matrix
designs. See below for fixture linking steps.
EACH FIXTURE MUST BE SECURED WITH ITS OWN SAFETY CABLE!
USE AN APPROPRIATELY RATED SAFETY CABLE (NOT INCLUDED) THAT
MEETS ALL LOCAL, NATIONAL, AND COUNTRY CODES AND REGULATIONS.
OVERHEAD RIGGING
Overhead rigging requires extensive experience, including amongst others calculating
working load limits, installation material being used, and periodic safety inspection of all
installation material and the fixture. If you lack these qualifications, do not attempt the
installation yourself. Improper installation can result in bodily injury and property damage.
Spring-Loaded Locking-Pins
1. The spring-loaded locking-pin has a stepped rail-block with two flat surfaces that, when
horizontally aligned with the rail, allow it to pass through (Notice that the ring orientation and the
flat surfaces of the stepped rail-block are perpendicular to each other).
2. Compress spring and turn locking-pin 90° (either direction) to lock pin into the rail. As the
rail-block of the spring-loaded locking-pin is stepped, it will snap the lock into place in a
horizontal orientation.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents