Assembly and start-up

The devices have been developed for practical application in a harsh indus-
trial environment. The installation process is correspondingly simple.
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:

Unpacking and checking

Setting up the device
Wall mounting
Pole mounting
Mounting/connecting external antennas
Connecting LAN and WLAN connections
Connecting the supply voltage
Grounding
Installing the data lines
Mounting the housing cover
Startup
Finding and configuring devices
2.1
Unpacking and checking
Check whether the contents of the package are complete
"Scope of
delivery").
Check the individual parts for transport damage.
2.2

Installing the device

To protect the exposed contacts of the components still to be installed from
dirt, the individual system components must be connected in a dry and clean
area. Seal unused ports with the cover caps supplied.
Note: Connectors are not electrical isolating devices.
Therefore, first plug the connector into the power supply plug and then switch
on the power supply.
Note: Protection class IP67 is only achieved if all the connected components
also fulfill protection class IP67.