Roll-In & Roll-Thru Installation - Delfield Specification Line GADTR1P-SH Original Instructions Service Manual

Table of Contents

Advertisement

Section 2
10. Locate the provided alternate top hinge bracket.
11. Place the hinge bracket over the top hinge pin.
12. Open the door.
13. Using the original screws install the hinge bracket on the
new side in the vacant lock holes.
14. Check for proper closure and gasket seal.
15. Adjust hinges as needed.
Part Number GA_SM 08/18
Roll-In & Roll-Thru Installation
NOTE: Local area codes may dictate other installation
requirements not mentioned.
1. Verify unit is level with 4' Level. Shim as needed.
Depending on the height of the shims, stainless trim may
be needed to fill in a large gap between the unit and the
floor.
2. Remove door sweep before making door adjustments.
3. Adjust doors hinges so door closes by itself.
• A properly adjusted door will close and seal when the
door is held open 3" or less with no assistance.
4. Reinstall door sweep. It may need to be reinstalled in
new holes so that it does not interfere with the door
closing.
• If it is too tight to ramp it will hold door open.
• Make sure sweep is just touching ramp when closed.
Sweep just touching
ramp
5. Verify once again that the door will close and seal when
held open 3" or less.
6. If this is a multi-section unit make sure door stays shut
or closes by itself when other doors are shut.
7. Using silicone, seal the ramp to the floor; seal the unit to
the floor and walls. The silicone will make sure that no
water can get under the unit or ramps.
If shims and stainless trim are added they also need to
be sealed to the unit and the floor.
Installation
Unit
Ramp
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Specification line gadbr1p-shSpecification line ga seriesSpecification line gadfl2p-sSpecification line gaf1p-sSpecification line gaf2p-sSpecification line gaf1p-sh ... Show all

Table of Contents