Download Print this page

Sanus Systems VM2 Assembly Instructions page 2

Hide thumbs Also See for VM2:

Advertisement

Diagram 1
Diagram 2a
i
h
c
Step 2b - Attaching to the Wall: Hardware for wood stud mounting is provided.
For all other mounting applications contact a local contractor or hardware store. Use
a high quality stud sensor to locate a stud. It is a good idea to verify the stud location
with an awl or thin nail as shown in Diagram 2. Use the Wall Plate (c) as a template to
mark the two hole locations on the wall. Make sure these holes are aligned vertically
and centered over the stud. Pre-drill the two holes to a depth of 2.5" using a 3/16" drill
bit. Attach the Wall Plate to the wall using the two Lag Bolts (d) as shown in Diagram
2b. Tighten the Lag Bolts firmly with the Allen Key (b).
Step 3 - Add Monitor Mount to Wall Plate: Once the LCD TV is attached to the
Monitor Mount (a), and the Wall Plate (c) is properly installed, set the tapered hole in
the Monitor Mount down over the cone shaped bushing on the Wall plate. This process
is shown without the TV in Diagram 3 so that you can see the parts more clearly. Make
sure the Monitor Mount is seated completely onto the Wall Plate. Add the Large Washer
(j). Next add the Cap (k). Make sure the square cut into the cap fits over the square top
of the Wall Plate bushing. Finally place the Knob (m) through the Small Washer (l), the Cap and into the cone shaped bushing. You can now set each of the knobs to the desired level of
tension.
Note: For institutional or heavy load applications a Knob Replacement bolt (f) may be used in place of each Knob and tightened with the Allen Key provided.
This will allow you to get greater tension while still being able to adjust the position of your TV.
Detailed View
e
d
g
c
Sanus Systems 2221 Hwy 36 West, Saint Paul, MN 55113 6.24.05
Customer Service: 800.359.5520. See complementary Sanus products at www.sanus.com
a
Diagram 2b
Diagram 2
Diagram 3
m
l
k
square cut in cap
j
a
square end of
bushing
c

Advertisement

loading