Timing Diagram; Start-Up; Test Run - Cedes TLS 600 Installation And Operation Manual

Hide thumbs Also See for TLS 600:
Table of Contents

Advertisement

TLS 600

9. Timing diagram

HIGH
Power supply
LOW
Object
Object detection
No object
HIGH
Test input
LOW
HIGH
Output
PNP-LO / NPN-DO
LOW
HIGH
Output
PNP-DO / NPN-LO
LOW
Figure 15: TLS 600 timing diagram
Power-up time
Response time
Release time
Response time test input
Time at test
Table 1: TLS 600 timing table

10. Start-up

1. Switch on mains and/or power up the controller.
2. Check if LED lights up  Chapter 11.
3. Perform a test run with the controller using the
test input  Chapter 10.1.
Important: Check the detection area of the sensor.
If adjustments to the sensor calibration are needed,
switch off main power and/or the controller again for
your own safety.
© CEDES | V 1.0
t
t
1
2
Time
Value
t
< 150 ms
1
t
< 150 ms
2
t
< 150 ms
3
t
< 150 ms
4
t
> t
5
4
t
3
Value
Output HIGH
≥ U
SP
Output LOW
Table 2: TLS 600 value table

10.1 Test run

It is recommended to perform a test run with the
controller:
1. Switch the test input to LOW.
2. Check the output's response  Chapter 9.
English
Test active
t
4
t
5
- 4 V
< 4 V
9