Installation; Transport & Placement; Opening The Case; Setting Up The Tlm-102 - Dual 10.1" Lcd Monitor - Datavideo GO KMU-100 STUDIO Instruction Manual

2-channel 4k to 8-channel hd portable video production studio
Table of Contents

Advertisement

Transport & Placement
The GO KMU-100 Studio is heavy and the weight is about 14kg – Do not attempt to lift or move it
on your own. It's recommended to have at least two people to move the GO KMU-100 Studio out
of the carton. If the GO KMU-100 Studio is packed in the 19" flight case, it needs one person only
to move the system.
Always use a trolley to safely transport the GO KMU-100 Studio over distances of 2 Metres or more.
The unit should be always moved and placed in a horizontal position; do not place or try to move
the unit in any other way as damage or injury could result.
Place the GO KMU-100 Studio on a strong, stable, flat surface that is capable of supporting the
weight. Do not use a folding or single leg table to support the GO KMU-100 Studio.

Opening the Case

1. Rest the HC-800 on a flat horizontal surface with the carry handle facing the user
2. Open the buckles on two sides of the carry handle.
3. Lift open the cover
4. Remove the GO KMU-100 Studio system from the case.
Setting up the TLM-102 – Dual 10.1" LCD Monitor
1. Bring the LCD panel into an upright viewing position.
2. After that, please refer to following chapter "How to Connect Internal Cables" to connect all the
cables according to the instructions.
3. After all of the cables are connected properly, just remember to turn on the power switch and
then it's time for you to enjoy the efficiency and the convenience of the GO KMU-100 Studio.

Installation

7

Advertisement

Table of Contents
loading

Table of Contents