Zte ZXSDR R8854 Hardware Installation page 26

Macro radio remote unit
Table of Contents

Advertisement

ZXSDR R8854 Hardware Installation
Figure 4-9 Installing an Expansion Bolt
Step
a
b
c
d
e
Installing the Fixing Clamp
4. Secure the fixing clamp to the wall with a torque of 40 N•m, with the nuts, spring
washers, and flat washers removed from the expansion bolts, see
SJ-20160405141455-003|2018-01-03 (R1.3)
Description
Slightly turn the expansion bolt clockwise to prevent it from moving freely.
Before hammering the expansion bolt with a claw hammer, take a nut with
the same specifications as the nut of this expansion bolt and turn the nut
until the top of nut is flush with that of the expansion bolt to avoid damaging
the thread during hammering.
Hammer the expansion bolt into the installation hole with a claw hammer.
Fasten the nut near the expansion tube clockwise to allow the expansion bolt
to fully expand.
Loosen the nut counterclockwise and remove the nut, spring washer, and flat
washer in turn for use during subsequent installation.
4-8
Figure
ZTE Proprietary and Confidential
4-10.

Advertisement

Table of Contents
loading

Table of Contents