ZXSDR R8854 Hardware Installation
Figure 2-1 Device Hoisting
1. Fixed pulley
2. Hauling rope
3. Hoisting rope
Caution!
Installer A on the tower cannot loosen the fixed rope until he confirms that the device
is securely placed on the tower platform.
2. Installer C on the ground binds the
RRU
tightly, see
Figure
2-2.
2-2
SJ-20160405141455-003|2018-01-03 (R1.3)
ZTE Proprietary and Confidential