Figure 2-2 Binds the RRU
Pass the hoisting rope through the handle and hoisting hole.
Pass the hauling rope through the handle on the top of the RRU, avoiding the
mounting bracket, and get the rope stuck between the grounding point and the
protection block at the bottom of the RRU. Bundle the
the grounding point and the protection block at the bottom of the RRU, ensuring that
the
RRU
3. Installer B on the ground drags the hoisting rope downwards. At the same time,
installer C pulls the hauling rope out wards to protect the device from colliding with
the tower when the device reaches the mounting platform, see
4. Lift the properly-packed engineering materials used for tower mounting onto the tower
in the manner mentioned above.
SJ-20160405141455-003|2018-01-03 (R1.3)
Note:
is bundled firmly.
Chapter 2 Installation Preparations
2-3
ZTE Proprietary and Confidential
RRU
with the rope between
Figure
2-1.
RRU