GE P50 Agile P253 Technical Manual page 58

Motor protection relay
Table of Contents

Advertisement

5 Configuration
ia = 0.00 A
ib = 0.00 A
ic
= 0.00 A
in1 = 0.00 A
in2 = 0.00 A
i0
= 0.00 A
i1
i2
Irms A = 0.00 A
Irms B = 0.00 A
Irms C = 0.00 A
BOC
TC
BOT
2.3.5.2
View Contents- Measurement 2 Submenu
MEASUREMENTS
Measurement 1
5-18
= 0.00 A
= 0.00 A
: 0
: 0
: 0 msec
This window shows secondary value of current in phase A and phase B.
This window shows secondary value of current in phase C and
measured earth current.
This window shows secondary value of internally derived earth current
and zero sequence current.
This window shows secondary value of positive sequence current and
negative sequence current.
This window shows secondary value of RMS current in phase A and
Phase B.
This window shows secondary value of RMS current in phase C and
Breaker operation counter.
This window shows Trip Counter and Breaker Operating Time
This menu is to view the Measurement 1 & Measurement 2
Submenu to view measurements related to phase current, earth current,
breaker operation, trip counter and breaker operating time.
P50 Agile P253
P253/EN M/C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents