Advertisement

EN
LINCE
230V/110V/24V
USER'S AND INSTALLER'S MANUAL
v8.0
REV. 03/2018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LINCE400 and is the answer not in the manual?

Questions and answers

Summary of Contents for Motorline professional LINCE400

  • Page 1 LINCE 230V/110V/24V USER’S AND INSTALLER’S MANUAL v8.0 REV. 03/2018...
  • Page 2: Table Of Contents

    00. CONTENT 01. SAFETY INSTRUCTIONS INDEX STANDARDS TO FOLLOW 01. SAFETY INSTRUCTIONS ATTENTION: STANDARDS TO FOLLOW 02.PACKAGE This product is certified in accordance with European Community INSIDE PACKAGE (EC) safety standards. 03. OPERATOR CHANGE MOTOR DIRECTION This product complies with Directive 2011/65/EU of the European MANUAL RELEASE Parliament and of the Council, of 8 June 2011, on the restriction of TECHNICAL SPECIFICATIONS...
  • Page 3: Safety Instructions

    01. SAFETY INSTRUCTIONS 01. SAFETY INSTRUCTIONS STANDARDS TO FOLLOW STANDARDS TO FOLLOW • It is important for your safety that these instructions are followed. • Before installing, the installer must verify that the equipment to be automated is • Keep these instructions in a safe place for future reference. in good mechanical condition, correctly balanced and opens and closes properly.
  • Page 4: Package

    02. PACKAGE 03. OPERATOR INSIDE PACKAGE CHANGE MOTOR DIRECTION In the package you will find the following components: The operator LINCE, is a product developed exclusively for the automatic opening of swing gates. 01• 02 Swing operators LINCE 02• 01 Control Board Besides being pratical, safe and powerful, this product has a new function incorporated so 03•...
  • Page 5: Operator

    03. OPERATOR 03. OPERATOR CHANGE MOTOR DIRECTION UNLOCK OPERATOR 03 • Loosen the screws of the Middle Part. 04 • Remove Middle Part. 01 • Remove the plastic cap from the rear Information engraved on the unlock shaft. end. D=Unlock || B=Lock 05 •...
  • Page 6: Technical Specifications 05A

    03. OPERATOR 04. INSTALLATION TECHNICAL SPECIFICATIONS VERTICAL INSTALLATION DIMENSIONS The operator LINCE must be installed with a small inclination , to prevent water infiltration LINCE300 LINCE400 LINCE600 through the extension arm. 230V 230Vac 50/60Hz 230Vac 50/60Hz 230Vac 50/60Hz For this, the front support must be fixed to the gate with a height lower than the height of •...
  • Page 7 Opening mechanical stopper Opening angle • LINCE300 95º 120 a 180 120 a 180 595 a 600 Opening angle • LINCE400 95º 160 a 200 120 a 180 695 a 700 • LINCE300 95º 120 a 180 120 a 180 895 a 900 •...
  • Page 8 04. INSTALLATION 04. INSTALLATION INSTALLATION STEPS INSTALLATION STEPS 04 • Install operator on the supports Pay attention to installation dimensions mentioned on pages 04B, 05A and 05B! • The operator must be placed on both supports the same time to avoid leaving 01 •...
  • Page 9: Installation Map

    04. INSTALLATION INSTALLATION MAP • CONTROL • INTERIOR • EXTERIOR • MOTOR LINCE • EXTERIOR • KEY • WARNING • ANTENNA BOARD PHOTOCELLS PHOTOCELLS PHOTOCELLS SELECTOR LAMP • JUNCTION LEGEND: • Connection cables It is important to use mechanical stoppers in the opening and closing position of the gate. It is important to use junction boxes for connections between motors, components and If not respected, components of the automation may suffer efforts for which they were not control unit.
  • Page 10: Troubleshooting

    05. TROUBLESHOOTING FINAL CONSUMERS INSTRUCTIONS INSTRUCTIONS FOR SPECIALIZED INSTALLERS Anomaly Procedure Behavior Procedure II Discovering the origin of the problem 1 • Open control box and check board and test them by connecting problem is on the control board. remove them from installation •Make sure you •...
  • Page 11: Components Test

    06. COMPONENTS TEST 06. COMPONENTS TEST 230V/110V MOTOR 24V MOTOR To detect if the malfunction is on the control board or on the motor is, sometimes, necessary To detect which are the components with problems in a 24V LINCE automatism instalation, to perform tests with connection directly to a 110V/230V power supply.
  • Page 12: Maintenance

    07. MAINTENANCE 07. MAINTENANCE MAINTENANCE MAINTENANCE • Clean stainless steel arm • Check motor supports • With a cloth soaked in lubricant spray, wipe any residue that accumulates on the operator’s •Make sure that supports remain well fixed on the pillars and gate to ensure proper functioning of stainless steel arm.
  • Page 13: Control Board Mc2

    08. CONTROL BOARD MC2 230/110V CONNECTIONS SCHEME Antenna * For more informations, check the manual Pedestrian of the photocells Opening to be installed. (1 leaf) Exterior Interior Photocells* Photocells* Close the circuit with bridge (shunt) Complete when the Opening photocells circuit (2 leaves) is not being used! Lock...
  • Page 14: Control Board Mc11

    09. CONTROL BOARD MC11 24V CONNECTIONS SCHEME Antenna (NC Contact) (NC Contact) (NC Contact) (NC Contact) Set of Set of Set of Set of Pushbutton photocells 1 photocells 2 photocells 3 photocells 4 (NC Contact) 12Vdc 3W Máx. Complete Opening Contact) COMPONENTS DIAGRAM Set of...

This manual is also suitable for:

Lince300Lince600

Table of Contents