Installation Procedure; Preparation For Installation On Upstream Equipment - Canon Paper Folding Unit-J1 Service Manual

Revision 3.0
Table of Contents

Advertisement

Installation Procedure

CAUTION:
Check that the main power switch is OFF and the
power plug is disconnected from the outlet.
Preparation for Installation on
Upstream Equipment
■ Connecting to the Host Machine
● For imagePRESS C10000VP/C8000VP
Series
1. Fix the 2 Latch Catches and the Positioning Pin to
the Host Machine. At this time, fix the Ground Plate
along with the Latch Catch in the rear side.
• 6 Screws (RS Tightening ; M4x8)
6x
RS Tightening ; M4x8
● For imagePRESS C850/C750/C650/C65
Series
1. Remove the 3 face covers.
• 3 Claws
2. Fix the 2 Clamp Plates and the Positioning Pin to the
host machine. At this time, fix the supplied Ground
Plate along with the rear Clamp Plate in the rear side.
• 6 Screws (RS Tightening ; M4x8)
6x
124
6. Installation
RS Tightening ; M4x8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents