Bi-Parting Gates Wiring - Dual Gate Operators - DoorKing 6500 Series Installation & Owner's Manual

Vehicular swing gate operator
Hide thumbs Also See for 6500 Series:
Table of Contents

Advertisement

2.3 Bi-Parting Gates Wiring - Dual Gate Operators

Connect the Primary/Secondary operators together with DoorKing's interconnection cable as shown (Different lengths sold
separately P/N 2600-75x). High voltage power and low voltage communications are supplied to the secondary operator by
DoorKing's UL approved cable that is run in a single conduit. Two conduits (High voltage and low voltage) will need to be
provided to the secondary operator when NOT using DoorKing's UL listed, wet environment interconnection cable.
Primary Operator Control Board (4405)
1
2
All loop detector, safety and access control devices
2
3
are wired to the primary operator.
1
4
2
3
4
5
4
1477-010
5
6
6
7
OB
7
8
CB
8
OE
9
CE
G
10
G
11
NC NO
SW 1,
12
switches 1
13
and 2 will
14
be opposite
15
each other.
16
Switch 6
MUST be
17
ON, see
18
page 21.
19
20
20
Primary Operator
8-Pin
Chassis
Ground
Secondary
Interface
Terminal
6500-065-J-7-18
Interconnection Cable Wiring
Primary Operator
(Red) Motor 1 High
(Blue) Motor 2 High
(White) Neutral 3 High
(Purple) 24VAC 4 Low
(Yellow) Limit 5 Low
(Brown) Spare 6 Low
(Orange) Limit 7 Low
(Gray) COM 8 Low
1
2
3
4
5
6
7
D o
P r i
Conduit
AC power
conduit to primary
operator only.
Secondary Operator
Motor 1 High (Red)
Motor 2 High (Blue)
Neutral 3 High (White)
24VAC 4 Low (Purple)
Limit 5 Low (Yellow)
Spare 6 Low (Brown)
Limit 7 Low (Orange)
COM 8 Low (Gray)
8
r o n
n v i
t E
W e
n e c
d (
c o n
i s t e
t e r
L L
y I n
' s U
d a r
i n g
c o n
o r K
S e
r y /
m a
Primary
Operator
secondary operator's heater. Refer to the instruction
Secondary Operator Terminal
Secondary operator contains
NO control board.
1
2
3
4
Operator
Chassis
Ground
Conduit
n t )
m e
e
a b l
n C
t i o
Optional Heater Installation Note:
If optional heaters are to be installed on
the operators, run two power wires through
the interconnection cable conduit to power the
sheet with the heater kit for more information.
5
6
7
8
Secondary
Operator
19

Advertisement

Table of Contents
loading

Table of Contents