Commutation reactors
Hide thumbs Also See for SINAMICS DCM:
Table of Contents

Advertisement

Electrical installation
Connection overview
Figure 4-1
Figure 4-2
Note
Installation sequence
When commutating reactors with SCCR of 20 ms and 100 ms are deployed, semiconductor
fuses must be installed in the rectifier system upstream of the reactor. These interrupting
times are then achieved by the semiconductor fuses that are normally used.
18
1-phase connection overview
3-phase connection overview
SINAMICS DCM commutating reactors
Operating Instructions, 11/2013, A5E32621741B