Siemens SINAMICS DCM Operating Instructions Manual page 15

Commutation reactors
Hide thumbs Also See for SINAMICS DCM:
Table of Contents

Advertisement

Mounting position
Alignment
The commutating reactor must be installed in the appropriate orientation in the cooling-air
flow, see following figure.
Figure 3-2
Distance from neighboring components
When the reactor is installed in the switch cabinet, a clearance of approximately 100 mm to
neighboring components is recommended. This clearance guarantees the heat dissipation of
the reactors. If the reactor is installed in a cabinet, it must be ventilated adequately.
Mounting holes, fastening screws
The commutating reactor is provided with 4 elongated holes. Layout and dimensions, see
dimension drawing (Section Dimension drawings (Page 33))
The commutating reactor must be fastened with 4 screws.
Table 3- 1
Commutating reactor
Order number = 6RX1800-...
4DK00; 4FK00; 4DE00; 4DE01; 4DE02; 4DE03
4DE04; 4DE05; 4DE06
4DK01; 4FK01; 4DK02; 4FK02; 4GK00; 4DK03; 4FK03; 4DE07
4DK04; 4FK04; 4GK01;
4DK05; 4FK05; 4DK06; 4GK02; 4FK06; 4DK07; 4DK08; 4FK07; 4FK08;
4GK03; 4DK10; 4FK10; 4GK04; 4FK13; 4DK12; 4KK02; 4GK10; 4KK03;
4GK11; 4FK14; 4LK00; 4DK11; 4GK05; 4GK06; 4FK11; 4FK12; 4KK00;
4KK01; 4GK07; 4GK08; 4DK13; 4DK14; 4GK12; 4FK15; 4KK04; 4GK13;
4FK16; 4FK17; 4LK01; 4KK05; 4GK14; 4KK06; 4GK15; 4FK18; 4DK15;
4LK02; 4GK16; 4GK17; 4LK03; 4MK00; 4KK07
SINAMICS DCM commutating reactors
Operating Instructions, 11/2013, A5E32621741B
Cooling air flow
Mounting position
Retaining screws
Mechanical installation
Screws (4x)
M4
M5
M6
M8
M10
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents