Pix 520 Feature Licenses - Cisco PIX Series User And Installation Manual

Cisco pix security appliance hardware
Table of Contents

Advertisement

PIX 520 Feature Licenses

If you are installing a DC voltage PIX security appliance, refer to the
section on page
The following options are available:
Step 6
a.
b.
c.
If you are ready to start configuring the PIX security appliance, power on the unit. Refer to the
configuration guide
http://www.cisco.com/en/US/products/sw/secursw/ps2120/prod_configuration_guides_list.html
Always check the
details. You can find the latest versions of release notes online at:
http://www.cisco.com/en/US/products/sw/secursw/ps2120/prod_release_notes_list.html
PIX 520 Feature Licenses
If you have a PIX 520-UR unrestricted feature license, the following options are available:
Note
It is very important to remove the chassis cover before installing circuit boards in the PIX 520. Even
though it appears possible to add or remove circuit boards from the back panel, removing the chassis
cover greatly simplifies the process.
Cisco PIX Security Appliance Hardware Installation Guide
5-6
5-21.
If you have a second PIX security appliance to use as a failover unit, install the failover feature and
cable as described in the
"Installing Failover" section on page
Note
Do not power on the failover units until the primary unit is configured.
If needed, install the PIX security appliance syslog server as described in the logging command page
in the
command reference
http://www.cisco.com/en/US/products/sw/secursw/ps2120/prod_command_reference_list.html
If you need to install an optional circuit board such as a single-port Ethernet board, or the four-port
Ethernet board, refer to the
more information.
If you need to install additional memory, refer to the
page
5-12.
online
at:
release notes
If you have a second PIX 520 to use as a failover unit, install the failover feature and cable as
described in the
"Installing Failover" section on page
If needed, install the PIX security appliance syslog server as described in the logging command in
the
command reference
online at:
http://cisco.com/en/US/products/sw/secursw/ps2120/prod_command_reference_list.html
Refer to the
"Installing LAN-Based Failover" section on page 5-8
remove and replace the chassis cover if you need to install optional circuit boards.
If you need to install additional memory, refer to the
page
5-12.
online at:
"Installing a Circuit Board in the PIX 520" section on page 5-15
first before configuring the PIX security appliance for the latest release
"Installing the PIX 520 DC Model"
5-7.
"Installing a Memory Upgrade" section on
5-7.
for information about how to
"Installing a Memory Upgrade" section on
Chapter 5
PIX 520
for
78-15170-03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents