Spray height control system ardi europe autoslant dah or dah09 (10 pages)
Summary of Contents for Norac UC4.5
Page 1
John Deere (30 Series Main Lift Option) Installation Manual...
Page 2
Reorder P/N: UC4.5-JD9-INST Rev A (John Deere 30 Series Main Lift Option) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
1 Introduction Congratulations on your purchase of the NORAC UC4.5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
2 Kit Parts Hydraulic Plumbing Figure 1: JD9 Hydraulic Plumbing...
Page 6
List of Parts The following tables list the John Deere 30 Series main lift kit (JD9) specific parts of the NORAC UC4.5 system. This kit is to be used when installing the proportional main lift option with existing John Deere installations.
Page 7
P - PIPE * Orifice F08 is not required when installing on a John Deere 4930. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
3 Ultrasonic Sensor Installation Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground. 2.
Page 9
Low Profile Bracket Mounting Guidelines 1. Minimize the distance between the bolts to prevent bending the bracket and prevent the bracket from loosening over time. 2. Ensure the bracket is mounted tight against the bottom of the boom, minimizing the distance between the boom structure and the angled flange.
Page 10
Main Lift Sensor Installation 1. The main lift mounting bracket (B21) is the bracket with the longer mounting flange. 2. There are a variety of ways to mount the main lift bracket on most sprayers. The bracket should position the sensor approximately in the center of the sprayer, forward of the boom.
Hydraulic pressure will exist on the main lift circuit unless the main lift is all the way down. Component failure due to oil contamination is not covered under the NORAC UC4.5 system warranty. It is recommended that a qualified technician perform the hydraulic installation. Expansion Block Assembly 1.
Page 12
The orifice is not required for John Deere 4930 sprayers. 2. Install the 6MBP plug (F09) into the “A” port of the expansion block. 3. If the valve block is not already installed on the sprayer, install it as outlined in the UC4.5 Spray Height Control installation manual.
Two connectors on C17 will remain disconnected. These are used when installing other UC4.5 options. 3. Install the two 2-pin connectors on the end of cable C17 to the expansion block. The connector marked “Main Up” goes on the port side of the block. The port side of the block is the side with the hose connections.
3. Turn on the power for the control panel using the switch on the side of the chassis. 4. Refer to the UC4.5 Spray Height Control Operator’s Manual to run an automatic install with the JD9 type selected.
Need help?
Do you have a question about the UC4.5 and is the answer not in the manual?
Questions and answers