Norac UC4.5 Installation Manual

Spray height control system spra-coupe 7x60 2008+
Hide thumbs Also See for UC4.5:

Advertisement

Quick Links

SPRA-COUPE 7X60 2008+
Installation Manual
SC2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UC4.5 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Norac UC4.5

  • Page 1 SPRA-COUPE 7X60 2008+ Installation Manual...
  • Page 2 Reorder P/N: UC4.5-BC-SC2-INST Rev A (SPRA-COUPE 7X60 2008+) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
  • Page 3: Table Of Contents

    Contents Introduction ........................ 1     General UC4.5 System Layout ................. 2     Kit Parts ........................3     Pre-Install Checklist ....................7     Ultrasonic Sensor Installation .................. 8     Roll Sensor Installation .................... 12    ...
  • Page 4: Introduction

    Introduction Congratulations on your purchase of the NORAC UC4.5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
  • Page 5: General Uc4.5 System Layout

    General UC4.5 System Layout Figure 1 illustrates the general layout of the UC4.5 system components: Figure 1: General UC4.5 System Layout...
  • Page 6: Kit Parts

    Kit Parts Kit Overview Figure 2: SC2 System Parts...
  • Page 7 Figure 3: SC2 Hydraulic Plumbing Do not use high speed power tools/drills when installing hardware. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
  • Page 8 UC5 NETWORK 6 PIN PLUG 44963D VALVE BLOCK ASSEMBLY 2 STATION CC/LS PROP DT 4 BOLT Optional Main Lift Kit An optional main lift sensor kit is available for purchase from NORAC. Part Number Name 4570BC UC4.5 MAIN LIFT OPTION - 44743...
  • Page 9 Hydraulic Fitting Kit Details (P/N: 44865-53) Picture Item Part Number Name Quantity 104369 PLUG - 6MBP 103345 ELBOW ADAPTER - 6MJ 6FJX90 103839 TEE ADAPTER - 6FJXR 6MJT 103195 TEE ADAPTER - 6MJT 103312 MALE ADAPTER - 6MB 6MJ 501308 MALE ADAPTER - 12MB 12MB 105016 TWO WAY ORIFICE INSERT 3/64"...
  • Page 10: Pre-Install Checklist

    Pre-Install Checklist The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.). 2. Ensure all boom-fold operations are functional (place a check mark in boxes below). 3.
  • Page 11: Ultrasonic Sensor Installation

    Ultrasonic Sensor Installation Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 5, following the instructions below. Figure 5: Breakaway Bracket Assembly 1. Compress the spring and insert it together with the collar into the base. 2. Slide the tube through the assembled part. 3.
  • Page 12 Ultrasonic Sensor Serial Number Arrangement When installing the sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each sensor has a serial number stamped on the sensor housing. Apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
  • Page 13 Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground (A). 2.
  • Page 14 If the sensor is mounted to this portion of the boom, the system will force the boom downwards towards the ground as the boom folds backwards. 4. Mount the NORAC ultrasonic sensor into the sensor bracket and run the sensor cable through the sensor tube.
  • Page 15: Roll Sensor Installation

    Roll Sensor Installation Bracket Assembly 1. Securely mount the roll sensors to the included roll sensor brackets using the #6 machine screws. Tighten screws to 10 in-lbs (1.1 Nm). 2. The orientation of the mounted roll sensor to the roll sensor bracket will depend on the bracket mounting.
  • Page 16 Roll Sensor Mounting Guidelines: Center Pivot Booms 1. When mounting the roll sensors, mount the roll sensor without the temperature probe on the boom frame and the roll sensor with the temperature probe on the chassis (non- pivoting portion of the sprayer). For optimal performance, minimize the distance between the roll sensors (A) and minimize the height from each roll sensor to the pivot point (B).
  • Page 17 Temperature Probe Once the block is mounted, fasten the temperature probe from E03 to the NORAC valve block using the included 3/8x1/2” bolt as illustrated in Figure 14. Figure 14: NORAC Valve Block with Temperature Probe Installed...
  • Page 18: Electrical Installation

    A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the Roll Over Protection Bar. Four pilot holes for the screws provided need to be drilled to facilitate the control panel mounting.
  • Page 19 6. On the left side of the electrical panel (Figure 16), there is a knockout. Remove the knockout and install the grommet (M15). The grommet may fit easier if it is cut radially (ie. like a lockwasher). 7. Route the Jam Valve Cable (C13) through the grommet. Connect the 2-pin shroud on C13 to the 2-pin tower on C10B.
  • Page 20 9. Connect 6-pin shroud on C04 to the 6-pin tower on C10B. 10. Disconnect C10A from C10B at the 4-pin Sense Line connectors (Figure 15). 11. Find the Spra Coupe joystick wiring harness located in the driver’s seat right-hand armrest. It will have four grey 24-pin square Deutsch connectors.
  • Page 21 18. Connect the valve interface cable (C03) to connector S6 on the valve extension cable (C04). 19. Connect the 2-pin connectors on the valve interface cable to the NORAC valve block, as shown in Figure 18. 20. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT DOWN and LEFT DOWN.
  • Page 22: Hydraulic Installation

    3. Install the 6MB-6MJ (F07) fittings into the “B” ports on the NORAC block. Tighten to 18 ft-lbs (24 Nm). 4. Install the 6MBP (F02) plugs into the “A” ports on the NORAC block and tighten to 18 ft- lbs (24 Nm).
  • Page 23 1. The recommended location for the valve is on the rear of the boom main section on the horizontal cross member, above the Spra-Coupe valve block. Orient the valve block so the NORAC block pressure and tank lines are on the same side as the Spra-Coupe pressure and tank lines.
  • Page 24 (F04) installed at the NORAC “T” port using the 6FJ 8MJ fitting (F12). Fitting F12 may not be needed for all installations. 11. Install hose H02 onto one of the tee fittings installed at the NORAC “T” port. Route the free end of hose H02 to the Spra Coupe valve block.
  • Page 25 13. Install a 6MJ 6FJX90 fitting (F03) onto each of the “B” ports on the NORAC valve block. Attach hose H03 to the “B” ports and route the free end of the hoses to the end of the Spray Coupe steel lines. These are located towards the outer portion of the center section frame.
  • Page 26: Software Setup

    2. If any functions do not work, review the hydraulic and electrical portions of this manual to check for proper installation. 3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis. 4. The procedure for the installation of the UC4.5 Spray Height Control system is now complete.
  • Page 27: 10 Cable Drawings

    10 Cable Drawings 10.1 ITEM C01: 44653-10 - CABLE UC4.5 ADAPTER MOLEX TO DEUTSCH 10.2 ITEM C03: 44656D – CABLE VALVE VARIABLE RATE DT...
  • Page 28 10.3 ITEM C04: 44651 - CABLE VALVE EXTENSION 10.4 ITEM C05: 43210-20 - CABLE UC5 NETWORK 18 AWG - 20M...
  • Page 29 10.5 ITEM C06: 43210-15 - CABLE UC5 NETWORK 18 AWG - 15M...
  • Page 30 10.6 ITEM C10: 44650-59 - CABLE UC4.5 POWER SPRA COUPE 7000 SERIES (CABLE A)
  • Page 31 10.7 ITEM C10: 44650-59 - CABLE UC4.5 POWER SPRA COUPE 7000 SERIES (CABLE B)
  • Page 32 10.8 ITEM C13: 44658-15 - CABLE UC4 JAM VALVE SPRA COUPE 7000 SERIES...
  • Page 33 TOPCON Agriculture Canada 3702 Kinnear Place Saskatoon, SK S7P 0A6 TOPCON Agriculture Americas W5527 Hwy 106 Fort Atkinson, WI 53538 TOPCON Precision Agriculture Europe Avenida de la industria, 35, Tres Cantos, España Spain Support Phone: 888 979 9509 E-mail: tasupportn@topcon.com Web: www.norac.ca...

Table of Contents