Spray height control system ardi europe autoslant dah or dah09 (10 pages)
Summary of Contents for Norac UC4.5
Page 1
AGCO TerraGator Standard Control Benson Boom Installation Manual...
Page 2
Reorder P/N: UC4.5-BC-TG1-INST Rev B (AGCO TerraGator Standard Control Benson Boom) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
Introduction Congratulations on your purchase of the NORAC UC4.5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
Kit Parts Kit Overview Figure 2: TG1 System Parts...
Page 7
MANUAL INSTALLATION UC4.5 TERRAGATOR STANDARD CONTROL BENSON WET BOOM Do not use high speed power tools/drills when installing hardware. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
2. Mount the sensor bracket onto the boom using B06. 3. Mount the NORAC ultrasonic MAX sensor into the sensor bracket and run the sensor cable either through hole in the back and behind the bracket. Ensure the cable is clear of moving parts.
A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the Roll Over Protection Bar. Four pilot holes for the screws provided need to be drilled to facilitate the control panel mounting.
Page 10
2. Connect the UC4.5 power cable (C10) to the UC4.5 control panel in the sprayer cab. Ensure both plugs (P16 and P4) are connected to the panel. Cable tie C10 to the RAM mount to help provide strain relief. Ensure the UC4.5 control panel’s power is OFF for the remaining installation (Bottom of switch pressed IN).
Page 11
9. Route cables C16 and C19 to the hydraulic valve block. 10. Tee the 2-pin connectors on cable C17 into the TerraGator wiring at each of the valve coils as shown in Table 2. Table 2: Interface Connections NORAC Interface Label Cable Number TerraGator Coil Left Up...
2. If any functions do not work, review the hydraulic and electrical portions of this manual to check for proper installation. 3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis. 4. The procedure for the installation of the UC4.5 Spray Height Control system is now complete.
Page 23
TOPCON Agriculture Canada 3702 Kinnear Place Saskatoon, SK S7P 0A6 TOPCON Agriculture Americas W5527 Hwy 106 Fort Atkinson, WI 53538 TOPCON Precision Agriculture Europe Avenida de la industria, 35, Tres Cantos, España Spain Support Phone: 888 979 9509 E-mail: tasupportn@topcon.com Web: www.norac.ca...
Need help?
Do you have a question about the UC4.5 and is the answer not in the manual?
Questions and answers