Page 2
Reorder P/N: UC4.5-BC-HG2-INST Rev B (Hagie 264, 284XP, DTS8, 2100, 2101, DTS10) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
1 Introduction Congratulations on your purchase of the NORAC UC4.5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
3 Kit Parts Kit Overview Figure 2: HG2 System Parts...
Page 7
Figure 3: HG2 Hydraulic Plumbing Do not use high speed power tools/drills when installing hardware. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Page 8
UC5 NETWORK 6 PIN PLUG 44963D VALVE BLOCK ASSEMBLY 2 STATION CC/LS PROP DT 4 BOLT Optional Main Lift Kit An optional main lift sensor kit is available for purchase from NORAC. Part Number Name 4570BC UC4.5 MAIN LIFT OPTION - 44743...
Page 9
Hydraulic Fitting Kit Details (P/N: 44865-14) Picture Item Part Number Name Quantity 103195 6MJT 104584 MALE TO FEMALE ADAPTER - 6MB 6FB 103071 MALE 90 DEGREE ADAPTER - 8MB 6MJ90 103814 MALE 90 DEGREE ADAPTER - 6MB 6MJ90 103312 MALE ADAPTER - 6MB-6MJ 44927 ORIFICE INSERT .031 IN ONE WAY 44928...
4 Ultrasonic Sensor Installation Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 4, following the instructions below. Figure 4: Breakaway Bracket Assembly 1. Compress the spring and insert it together with the collar into the base. 2. Slide the tube through the assembled part. 3.
Page 11
Ultrasonic Sensor Serial Number Arrangement When installing the sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each sensor has a serial number stamped on the sensor housing. Apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Page 12
Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground (A). 2.
Page 13
If the sensor is mounted to this portion of the boom, the system will force the boom downwards towards the ground as the boom folds backwards. 4. Mount the NORAC ultrasonic sensor into the sensor bracket and run the sensor cable through the sensor tube.
5 Roll Sensor Installation Bracket Assembly 1. To mount the roll sensors, the roll sensor brackets will have to be bent. The brackets are supplied with a 90° bend and must be bent back to a 45° bend. 2. Securely mount the roll sensors to the included roll sensor brackets using the #6 machine screws.
Page 15
Roll Sensor Mounting Guidelines: Front Mounted Rigid Booms 1. When mounting the roll sensors, mount the roll sensor with the temperature probe on the boom and the roll sensor without the temperature probe on the chassis near the sprayer cab. Figure 10: Roll Sensor Mounting on a Trapeze Suspended Boom 2.
Page 16
Figure 12: Chassis Roll Sensor Mounting Location Temperature Probe Once the block is mounted, fasten the temperature probe from E03 to the NORAC valve block using the included 3/8x1/2” bolt as illustrated in Figure 13. Figure 13: NORAC Valve Block with Temperature Probe Installed...
1. Install the UC4.5 Control Panel (E01) in the cab of the sprayer. Mount the panel where it will be clearly visible and within easy reach of the operator. In the Hagie cab, a good spot to mount the UC4.5 control panel is on the right hand side of the cab, next to the spray controller.
Page 18
7. Route C04 and C06 to the front of the sprayer in the vicinity of the valve block. 8. Connect the valve cable (C03) to C04. Connect the 2-pin connectors on C03 to the NORAC valve block, as shown in Figure 15. 9. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT DOWN and LEFT DOWN.
Valve Assembly 1. On a clean surface remove the plastic plugs from the block. 2. Install two 6MB-6MJ (F05) fittings on the “P” and “T” ports on the NORAC block. Tighten to 18 ft-lbs (24 Nm). 3. Insert the two orifices (F08) into the “B” ports with the notch facing out.
Page 20
1. A suitable mounting location for the valve block is illustrated in Figure 17. 2. Bolt the NORAC valve block to the mounting bracket (B12). 3. Remove the two bolts holding the Hagie valve block in place on the right side of the center rack.
Page 21
1. After the NORAC valves are mounted, the hydraulic hoses and fittings can be plumbed. The plumbing for the hydraulic circuit is shown schematically in Figure 3. 2. Connect hoses from the NORAC “P” and “T” ports to the “P” and “T” ports on the sprayer valve block using fittings F03.
2. If any functions do not work, review the hydraulic and electrical portions of this manual to check for proper installation. 3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis. 4. The procedure for the installation of the UC4.5 Spray Height Control system is now complete.
Page 27
TOPCON Agriculture Canada 3702 Kinnear Place Saskatoon, SK S7P 0A6 TOPCON Agriculture Americas W5527 Hwy 106 Fort Atkinson, WI 53538 TOPCON Precision Agriculture Europe Avenida de la industria, 35, Tres Cantos, España Spain Support Phone: 888 979 9509 E-mail: tasupportn@topcon.com Web: www.norac.ca...
Need help?
Do you have a question about the UC4.5 and is the answer not in the manual?
Questions and answers