Energize/Startup
Procedures
CAUTION: Fire Hazard
!
Before energizing, confirm that all hardware
is installed as shown on the Installation
page. Stacking battery terminal hardware in
any other order can overheat the terminals.
Pre-startup Procedures:
1.
Double-check all wiring connections.
2.
Inspect the enclosure to ensure no
debris or tools have been left inside.
3.
Disconnect all AC loads at the backup
(or critical) load panel.
4.
Disconnect the AC input feed to
the GSLC at the source.
To energize or start the OutBack devices:
1.
Using a digital voltmeter (DVM), verify 48 Vdc
on the DC input terminals by placing the DVM leads
1a
1b
on
and
.
Confirm that the battery voltage is correct for the
inverter and charge controller models.
Confirm the polarity.
CAUTION: Equipment Damage
!
Incorrect polarity will damage the equipment.
1
2.
Turn on (close) the GFDI circuit breaker.
3.
Verify that the PV input for each charge controller
is in the correct range of open-circuit voltage and
confirm the polarity by:
2a
1b
a) placing the DVM leads on
and
, and
2b
1b
b) placing the DVM leads on
and
.
2
4.
Turn on (close) the PV input circuit breakers.
5.
Turn on (close) the DC circuit breakers from the battery bank to the inverter.
4
6.
If the inverter is in the Off state, turn it On.
7.
Verify 120 Vac on the AC Output L1 TBB by placing the DVM leads on
3b
3c
8.
Verify 120 Vac on the AC Output L2 TBB
and
9.
Verify 240 Vac between the AC Output TBBs by placing the DVM leads on
5
10. Turn on (close) the AC output circuit breakers.
11. Start the generator if appropriate. Verify 120/240 Vac on the terminals of the AC input sources.
12. Turn on the AC input feed to the GSLC at the source.
11. Verify 120 Vac on the GRID IN L1 TBB by placing the DVM leads on
4b
3c
12. Verify 120 Vac on the GRID IN L2 TBB
and
13. Verify 240 Vac between the GRID IN TBBs by placing the DVM leads on
14. Verify 120 Vac on the GEN IN L1 TBB by placing the DVM leads on
5b
3c
15. Verify 120 Vac on the GEN IN L2 TBB
and
.
16. Verify 240 Vac between the GEN IN TBBs by placing the DVM leads on
6
17. Turn on (close) the AC input circuit breakers.
18. Turn on the AC disconnects at the backup (or critical) load panel and test the loads.
900-0162-01-00 Rev A.vsd\Page-3\2014-01-24
©2014 OutBack Power Technologies. All Rights Reserved.
Battery Voltage Test Points
PV Voltage Test Points
2a
4
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
GRID IN Voltage Test Points
(Terminal bus bar = TBB)
GEN IN Voltage Test Points
(Terminal bus bar = TBB)
5
1b
6
3
6
In
23.2 V
0.0 A
3a
Out
27.6 V
0.0 A
4a
5a
1a
0.000 kW
0.0 kWH
AUX:
OFF
Sleeping
1
2a
3c
2
2b
4b
5b
3b
3
3a
3c
and
.
.
3a
3b
and
.
4a
3c
and
.
.
4a
4b
and
.
5a
3c
and
.
5a
5b
and
.
De-energize/Shutdown
Procedures
Functional
Test Points
1a
1b
2b
2c
2d
1b
3a
3b
3c
4a
4b
3c
5a
5b
3c
WARNING: Burn Hazard
In
23.2 V
0.0 A
Out
27.6 V
0.0 A
Internal parts can become hot
0.000 kW
0.0 kWH
AUX:
OFF
Sleeping
during operation. Do not
remove the cover during
operation or touch any internal
parts. Be sure to allow them
sufficient time to cool down
before attempting to perform any
maintenance.
WARNING: Lethal Voltage
Review the system configuration to identify all
possible sources of energy. Ensure ALL
sources of power are disconnected before
performing any installation or maintenance on
this equipment. Confirm that the terminals are
de-energized using a validated voltmeter
(rated for a minimum 1000 Vac and 1000 Vdc)
to verify the de-energized condition.
WARNING: Lethal Voltage
The numbered steps will remove power from
the inverter and charge controllers. However,
sources of energy may still be present inside
the GSLC and other locations. To ensure
absolute safety, disconnect ALL power
connections at the source.
RADIAN Series
Functional
Test Points
Battery Voltage Test Points
1a
1b
PV Voltage Test Points
2a
2b
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
3a
1c
1d
1b
1
1
2
In
23.2 V
0.0 A
In
23.2 V
3a
Out
27.6 V
0.0 A
Out
27.6 V
0.000 kW
0.0 kWH
0.000 kW
AUX:
OFF
Sleeping
AUX:
OFF
4
2c
3c
3
3b
2d
Test points 2c and 2d refer to the
right terminal of each circuit breaker.
To de-energize or shut down the OutBack devices:
1
1.
Turn off (open) the AC circuit breakers.
2.
Turn off (open) the DC circuit breakers for the battery.
Wait 5 minutes for the devices to internally discharge themselves.
3
3.
Turn off (open) the PV circuit breakers.
4
4.
Turn off (open) the GFDI circuit breaker.
5.
Verify 0 Vdc on the first DC bus of the inverter by placing the voltmeter
1b
1c
leads on
and
.
6.
Verify 0 Vdc on the second DC bus by placing the voltmeter leads on
1d
and
.
7.
Verify 0 Vdc on one PV circuit by placing the voltmeter leads on
1b
and
.
8.
Verify 0 Vdc on the other PV circuit by placing the voltmeter leads on
1b
and
.
9.
Verify 0 Vac on the AC output circuit breakers by placing the voltmeter
3a
3c
leads on
and
. Repeat this step for
1c
1d
2c
2d
1b
3b
3c
0.0 A
0.0 A
0.0 kWH
Sleeping
2
1b
2c
2d
3b
3c
and
.

Advertisement

loading
Need help?

Need help?

Do you have a question about the RADIAN Series and is the answer not in the manual?

This manual is also suitable for:

Gslc175pv1-120/240Gs8048aMate3 depictedGs4048aGslc175-pv-120/240