M AT E3 Progra m m ing
I M PORT AN T :
Programming should be done by a qualified installer who is trained on programming inverter power systems. Failure to program accurate parameters for the
system could potentially cause equipment damage. Damage caused by inaccurate programming is not covered by the limited warranty for the system.
N ot e : For automatic generator
start features see the MATE3
manual for details.
900-0153-01-00 Rev A.vsd\ Page-1\ 2013-01-17
© 2012 OutBack Power Technologies. All Rights Reserved.
Com pone nt s
GS8 0 4 8 I nve rt e r/Cha rge r
M AT E3
Syst e m
Displa y a nd
Cont rolle r
Com m unic a t ion
M a na ge r
(H U B1 0 )
GS Loa d Ce nt e r
(GSLC)
FN DC LED I ndic a t ors
Color
Ba t t e ry St a t e -of-Cha rge
Green
> 90% (blinks if charge parameters are met)
≥ 80%
Yellow
≥ 70%
Yellow
≥ 60%
Yellow
≥ 60% off, < 60% solid, < 50% blinks
Red
RADIAN Series
M a jor Com pone nt s
Ra dia n Syst e m Produc t s
Inverter/Charger
GS8048
GSLC175-PV-120/240
GS Load Center
System Display
MATE3 (FW-MB3
mounting bracket)
and Controller
Communications
HUB10
Manager
HUB 4
FLEXnet DC Monitor (FNDC)
Surge Protector
Remote Temperature Sensor (RTS)
FLEX m a x 8 0
Opt iona l Out Ba c k Com pone nt s
Cha rge Cont rolle rs
(x 2 ) (Opt iona l)
FLEXmax 80*
Charge Controller
FLEXmax 60*
*Including appropriate Mounting Bracket.
PV8
PV Combiner Box
PV12
Cust om e r-Supplie d Com pone nt s
AC Source
Main Electrical Panel
(or overcurrent device for
the AC source)
Electrical Distribution Subpanel
(Load Panel)
Battery Bank
Photovoltaic (PV) Array
(with PV Combiner Box [PV8 or PV12])
I M PORT AN T :
Not intended for use with
life support equipment.
Cont a c t T e c hnic a l Support :
Telephone: +1.360.618.4363
Email:
Support@outbackpower.com
Website:
www.outbackpower.com
Utility Grid, or
AC Generator
Need help?
Do you have a question about the RADIAN Series and is the answer not in the manual?
Questions and answers