GDD Instrumentation MPP-EM2S Plus Instruction Manual page 20

Mpp probe
Hide thumbs Also See for MPP-EM2S Plus:
Table of Contents

Advertisement

*** If the INITIALIZATION message still appears, see Section 17 – Troubleshooting.
Instrumentation GDD Inc.
7. Enter the sample diameter or select the 'Wall' option for a
flat surface. Click on Confirm.
8. Set the different parameters you need to use (see Section
10 – Setting parameters) according to the reading mode
you chose (see Section 11 – Reading modes). Once the
setting is finished, come back to the GDD logo screen, keep
the end of the probe far from metal objects (point it
towards the sky) and initialize it by taping on the GDD logo.
9. The INITIALIZATION message should flash for few seconds
and after this, the reading screen should appear. You are
ready to take readings according to the reading mode you
chose (see Section 11 – Reading modes).
2018-01-16
19

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for GDD Instrumentation MPP-EM2S Plus

Table of Contents